Zelar Trust
Construction Sector

Construction & Engineering

Every project is a temporary organisation with its own systems, its own partners and its own end date. We give the programme a security model that stands up from mobilisation to handover.

  • ISO 27001
  • ISO 19650 Aligned
  • PDPL
  • Cyber Essentials
Project Delivery Security

Discover solutions for contractors and engineers

Security that mobilises with the project and demobilises cleanly — because access that outlives a contract is where this sector actually loses data.

Govern a project that is half other people's staff

A major programme runs on joint ventures, subcontractors, consultants and client teams, all needing the same design data and none of them on your payroll.

Challenges

Why project access sprawls

  • Partners arrive faster than governance

    Mobilisation pressure means access is granted first and documented later, and the review that would tidy it never gets scheduled.

  • Nobody offboards at handover

    When a package completes, the team disperses but the credentials remain — often with full access to the whole design set.

Solutions

How ZelarTrust responds

  • Access bound to the contract

    Rights are issued against a package and its dates, so they lapse at practical completion without anyone remembering to revoke them.

  • Project-scoped data environments

    Each programme gets its own boundary, so a partner on one project cannot see the design set or commercials of another.

Protect design IP and commercial position

Models, method statements and tender pricing are the firm's competitive position. They travel constantly and are rarely classified.

Challenges

What is actually at risk

  • The model set is the asset

    A full BIM model carries method, sequencing and cost intelligence a competitor or a hostile actor can use directly.

  • Site networks built for speed

    Temporary site offices run on consumer connectivity and shared equipment, standing up in days with no security review.

Solutions

How ZelarTrust responds

  • Classified, watermarked design distribution

    Model and drawing releases are classified, watermarked and tracked, so a leaked set can be traced to the recipient it came from.

  • A deployable site network standard

    One pre-built, hardened site network profile that mobilises in days and gives temporary offices permanent-grade controls.

Programme-Aligned Delivery

The GRC Engagement Model

How we make security part of mobilisation and demobilisation rather than a corporate policy the project never reads.

  1. Step 1: Programme Review

    Audit the data environment, partner access and site IT across live projects.

  2. Step 2: Boundary Design

    Give each programme its own scope so partners cannot cross between projects.

  3. Step 3: Contract Binding

    Tie access rights and expiry to package dates written into the contract.

  4. Step 4: Handover Assurance

    Prove clean demobilisation and hand the client a documented security position.

Common Inquiries

Frequently Asked Questions

How do you secure a joint venture where we are not the lead partner?

By securing your contribution rather than the venture. Your design data, staff and systems sit inside a boundary you control and expose only what the JV agreement requires. It works whether you lead the venture or join it, and it does not depend on the other partners adopting your standards.

Can site IT really be secured in the timescales we mobilise on?

Yes, because the work happens once rather than per site. We build a single hardened site profile — connectivity, endpoints, access, logging — and each new site deploys from it. Mobilisation gets faster, not slower, because nobody is improvising the setup on arrival.

Book a construction GRC consultation

Our engineers will review a live programme, show you which demobilised partners still hold access, and outline a 90-day plan.